Battersea Power Station

Client

Keltbray

Value

£110,000

Battersea Power Station

Work Scope

Intumescent Paint

B-Line created large openings within the heavily reinforced concrete walls at Battersea Power Station for the major redevelopment works taking place there. Some of these walls were situated within asbestos exclusion zones so our health and safety procedures needed to be stringent. At Battersea park we also drilled into piles for concrete testing in asbestos conditions