KELTBRAY / SRM / ASME ENGINEERING
£90,000
The AELTC is the heart of the tennis world and the Crown Jewel of Wimbledon Town, so when a retractable roof was required to be installed over Court No 1. B-Line stepped up to the challenge. Working for multiple contractors, B-Line precision drilled approx. 20,000 holes in 6 Weeks to allow the roof contractor to position the roof structure; any delay in this would have caused ramifications far wide spreading with the upcoming Championships on the horizon. B-Line completed the job within this very tight margin and allowed commissioning of the roof in time for the 2019 tournament.
Get in touch for further details on projects or quotes