Work Scope

20,000 holes/wire sawing/track sawing

The AELTC is the heart of the tennis world and the Crown Jewel of Wimbledon Town, so when a retractable roof was required to be installed over Court No 1. B-Line stepped up to the challenge. Working for multiple contractors, B-Line precision drilled approx. 20,000 holes in 6 Weeks to allow the roof contractor to position the roof structure; any delay in this would have caused ramifications far wide spreading with the upcoming Championships on the horizon.  B-Line completed the job within this very tight margin and allowed commissioning of the roof in time for the 2019 tournament.

Go To Top