Work Scope

Track sawing/Diamond drilling/bursting/resin anchor fixing/pull testing

B-Line bought the largest tracked Wire Saw in Europe down to Somerset to complete concrete cutting works on the site of HPC, the governments latest venture into building new Power Plants for the future. We also carried out track sawing works on the RC slab to reduce its size considerably, cutting through 141lm of 715mm deep concrete.This was a huge technical challenge for the team, with tight time management constraints however the job was completed on time and under budget.